1695 George Webster Dr
AvailableEV charging station in San Bernardino, California on the Loop network — 2 Level 2. US DOE AFDC station 453123.
At a glance
1695 George Webster Dr is a public EV charging station at 1695 George Webster Dr in San Bernardino, California, on the Loop network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 7, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 453123 |
| Network | Loop |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Oct 7, 2024 |
| Last updated at source | Sep 22, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1695 George Webster Dr
- City
- San Bernardino
- State
- California
- ZIP
- 92408
- Coordinates
- 34.09485, -117.24905
Within ~15 km
Nearby charging
- United Parcel Service100 ports
Non-networked · Available
- Siena Apartments80 ports
Loop · Available
- Greenlane Charging Center41 ports
Non-networked · Available
- Sage Apartments40 ports
Loop · Available
- Skypark Santa Village39 ports
evGateway · Available
- Meridian Terrace32 ports
Loop · Available
What kind of charging does 1695 George Webster Dr offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a other location.
How does 1695 George Webster Dr compare with other stations in San Bernardino?
San Bernardino has 165 charging stations in the DOE registry with 652 ports, the 21st-most of 812 cities and towns in California. 1695 George Webster Dr accounts for under 1% of the charging ports in San Bernardino. Loop runs 7 stations in San Bernardino. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates 1695 George Webster Dr?
Loop operates 1,233 stations in the registry across 40 states, with 162 DC fast and 9,900 Level 2 ports in total. 591 of those stations are in California, 3% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 7, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Sep 22, 2026.
Frequently asked questions
How many chargers does 1695 George Webster Dr have?
1695 George Webster Dr has 2 charging ports: 2 Level 2.
Does 1695 George Webster Dr have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does 1695 George Webster Dr have?
1695 George Webster Dr has J1772 connectors.
Is 1695 George Webster Dr open to the public?
Yes. 1695 George Webster Dr is listed with public access, and its status is available.
Where is 1695 George Webster Dr?
1695 George Webster Dr is at 1695 George Webster Dr, San Bernardino, CA 92408. Its coordinates are 34.09485, -117.24905.
More EV charging around San Bernardino
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 453123, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “1695 George Webster Dr, San Bernardino, CA (AFDC station 453123)”, https://chargecensus.com/stations/california/1695-george-webster-dr-453123 (data as of October 12, 2026).