ChargeCensus

12801 12801 #3

Temporarily unavailable

EV charging station in City of Industry, California on the ChargePoint network — 2 Level 2. US DOE AFDC station 176741.

At a glance

12801 12801 #3 is a public EV charging station at 12801 Crossroads Pkwy S in City of Industry, California, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as temporarily unavailable, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID176741
NetworkChargePoint
StatusTemporarily unavailable (T)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
12801 Crossroads Pkwy S
ZIP
91746
Coordinates
34.02914, -118.02524

Within ~15 km

Nearby charging

What kind of charging does 12801 12801 #3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about half of the California average of 3.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 12801 12801 #3 compare with other stations in City of Industry?

City of Industry has 83 charging stations in the DOE registry with 199 ports. 12801 12801 #3 accounts for 1% of the charging ports in City of Industry. ChargePoint runs 76 stations in City of Industry. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.

Who operates 12801 12801 #3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 14,675 of those stations are in California, 67% of the state's 21,814.

What does the “Temporarily unavailable” status mean?

“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 5,186 stations in California with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 12801 12801 #3 have?

12801 12801 #3 has 2 charging ports: 2 Level 2.

Does 12801 12801 #3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 12801 12801 #3 have?

12801 12801 #3 has J1772 connectors.

Is 12801 12801 #3 open to the public?

Yes. 12801 12801 #3 is listed with public access, and its status is temporarily unavailable.

Where is 12801 12801 #3?

12801 12801 #3 is at 12801 Crossroads Pkwy S, City of Industry, CA 91746. Its coordinates are 34.02914, -118.02524.

More EV charging around City of Industry

Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 176741, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “12801 12801 #3, City of Industry, CA (AFDC station 176741)”, https://chargecensus.com/stations/california/12801-12801-3-176741 (data as of October 12, 2026).