1001 Marina Village Pkwy
AvailableEV charging station in Alameda, California on the EVgo network — 9 DC fast. US DOE AFDC station 367821.
At a glance
1001 Marina Village Pkwy is a public EV charging station at 1001 Marina Village Pkwy, 101 in Alameda, California, on the EVgo network. It has 9 charging ports (9 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Nov 10, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 367821 |
| Network | EVgo |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 10, 2024 |
| Last updated at source | Oct 11, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1001 Marina Village Pkwy, 101
- City
- Alameda
- State
- California
- ZIP
- 94501
- Coordinates
- 37.78486, -122.27175
Within ~15 km
Nearby charging
- City of San Francisco - 49 SVN91 ports
PowerFlex · Available
- Zum Services, Inc.74 ports
Non-networked · Available
- Adobe - SF Office - Phase 152 ports
PowerFlex · Available
- Pacific Renaissance Plaza Garage40 ports
Flash · Available
Tesla Destination · Available
- Airport Corporate Center36 ports
PowerFlex · Available
What kind of charging does 1001 Marina Village Pkwy offer?
Of its 9 ports, 9 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 2.4 times the California average of 3.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does 1001 Marina Village Pkwy compare with other stations in Alameda?
Alameda has 55 charging stations in the DOE registry with 144 ports. 1001 Marina Village Pkwy accounts for 6% of the charging ports in Alameda. EVgo runs 2 stations in Alameda. Statewide, California has 21,814 stations and 81,788 ports, the largest station count of the 51 states and DC. The biggest station in California, Viejas Casino and Resort in Alpine, has 432 ports.
Who operates 1001 Marina Village Pkwy?
DC fast-focused urban charging network. EVgo operates 1,220 stations in the registry across 48 states, with 5,381 DC fast and 120 Level 2 ports in total. 426 of those stations are in California, 2% of the state's 21,814.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 10, 2024, one of 2,233 stations in California with a 2024 open date. The station's record was last updated at the source on Oct 11, 2026.
Frequently asked questions
How many chargers does 1001 Marina Village Pkwy have?
1001 Marina Village Pkwy has 9 charging ports: 9 DC fast.
Does 1001 Marina Village Pkwy have DC fast charging?
Yes. The registry lists 9 DC fast ports at 1001 Marina Village Pkwy, with CCS connectors.
What connectors does 1001 Marina Village Pkwy have?
1001 Marina Village Pkwy has CCS connectors.
Is 1001 Marina Village Pkwy open to the public?
Yes. 1001 Marina Village Pkwy is listed with public access, and its status is available.
Where is 1001 Marina Village Pkwy?
1001 Marina Village Pkwy is at 1001 Marina Village Pkwy, 101, Alameda, CA 94501. Its coordinates are 37.78486, -122.27175.
More EV charging around Alameda
Working with California charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 367821, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “1001 Marina Village Pkwy, Alameda, CA (AFDC station 367821)”, https://chargecensus.com/stations/california/1001-marina-village-pkwy-367821 (data as of October 12, 2026).