ChargeCensus

EV charging in Fontana, CA

35 charging stations in Fontana, California — networks, port mixes and a page for every station.

Dataset updated . Refreshed weekly from the US DOE Alternative Fuels Data Center.

At a glance

Fontana, California has 35 EV charging stations in the US DOE registry (33 public) with 92 charging ports: 31 DC fast and 61 Level 2. That is the 128th-most of 812 cities and towns in California. ChargePoint runs the most stations here (25).

Stations
35
Public
33
DC fast ports
31
Level 2 ports
61

Port ranking

Biggest stations in Fontana

#StationPortsNetwork
1Fontana, CA - Tesla SuperchargerAvailable24Tesla Supercharger
2Fontana Community Senior Center (Reduced Charging 4-9pm)Available6EV Connect
3A.B. Miller High SchoolAvailable6Blink
4Fontana Ignite FuelingAvailable5evGateway
510744 Almond AveAvailable5Loop
6Fontana EV #1-6 Fontana EV #1Available2ChargePoint
7Fontana EV #1-6 Fontana EV #5Available2ChargePoint
8Fontana EV #1-6 Fontana EV #7Available2ChargePoint
9Fontana EV #1-6 Fontana EV #9Available2ChargePoint
10McDonaldsAvailable2Blink
11Fontana EV #1-6 Pw City YardsAvailable2ChargePoint
12Fontana EV #1-6 Stage Red 8Available2ChargePoint
13Fontana EV #1-6 Stage Red 10Available2ChargePoint
14Fontana EV #1-6 Stage Red 9Available2ChargePoint
15Fontana EV #1-6 Stage Red 11Available2ChargePoint

🔒 Create a free account to export CSV — all 35 in Fontana · already signed in? Export from your account →

Operators

Networks here

Growth

Stations opened by year

2011
1
2019
2
2020
1
2021
5
2023
10
2024
1
2025
14
2026
1

How many public EV charging stations are in Fontana?

Of the 35 stations the registry lists in Fontana, 33 are open to the public and 2 are private (fleet, workplace or residential). The average station here has 2.6 ports, about 30% below the California average of 3.7. Fontana holds under 1% of California's 21,814 charging stations.

Where is DC fast charging in Fontana?

Fontana has 31 DC fast ports (often called Level 3 charging) at 5 public stations. The largest are Fontana, CA - Tesla Supercharger (24 DC fast), Fontana Ignite Fueling (4 DC fast), Fh Delivery 12339 Fh Svc (1 DC fast) and Fh Delivery 121a4 Fh Svc (1 DC fast). 1 of them is a Tesla Supercharger site. Across the public stations, 4 list CCS, 1 lists NACS (Tesla) and 4 list CHAdeMO connectors.

What kinds of places have EV chargers in Fontana?

Where the registry records the site type, the most common hosts are shopping center (1) and other (1).

Which charging networks operate in Fontana?

By station count, the networks in Fontana are led by ChargePoint (25), Blink (3), evGateway (2) and EV Connect (1). 2 stations are non-networked. 7 networks in all have stations here.

How fast is EV charging growing in Fontana?

The earliest station open year on record in Fontana is 2011. 14 stations opened in 2025, compared with 1 in 2024. 1 more have opened so far in 2026.

Directory

All 33 public charging stations in Fontana

Frequently asked questions

How many EV charging stations are in Fontana, CA?

The US DOE registry lists 35 charging stations in Fontana, California (33 public), with 92 charging ports: 31 DC fast and 61 Level 2.

Where can I fast-charge in Fontana?

Fontana has 31 DC fast ports. The biggest DC fast sites are Fontana, CA - Tesla Supercharger (24 ports), Fontana Ignite Fueling (4 ports) and Fh Delivery 12339 Fh Svc (1 port).

Which charging networks operate in Fontana?

By station count: ChargePoint (25), Blink (3), Non-networked (2), evGateway (2) and EV Connect (1).

Are there Tesla Superchargers in Fontana?

Yes. The registry lists 1 public Tesla Supercharger site in Fontana: Fontana, CA - Tesla Supercharger (24 DC fast ports).

More EV charging near Fontana

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “EV charging in Fontana, CA”, https://chargecensus.com/ev-charging/california/fontana (data as of October 12, 2026).