ChargeCensus

Fremont Motor Rawlins

Available

EV charging station in Rawlins, Wyoming, not on a charging network — 1 Level 2. US DOE AFDC station 422181.

At a glance

Fremont Motor Rawlins is a public EV charging station at 823 E Cedar St in Rawlins, Wyoming, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 12, 2025.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 3 nearby

Station record

DOE registry record

FieldValue
AFDC station ID422181
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateSep 12, 2025
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
823 E Cedar St
City
Rawlins
State
Wyoming
ZIP
82301
Coordinates
41.79065, -107.22831

Within ~15 km

Nearby charging

What kind of charging does Fremont Motor Rawlins offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 64% below the Wyoming average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a car dealership location.

How does Fremont Motor Rawlins compare with other stations in Rawlins?

Rawlins has 4 charging stations in the DOE registry with 17 ports, the 12th-most of 40 cities and towns in Wyoming. Fremont Motor Rawlins accounts for 6% of the charging ports in Rawlins. Statewide, Wyoming has 137 stations and 378 ports, the 48th-largest station count of the 51 states and DC. The biggest station in Wyoming, Lexington at Jackson Hole in Jackson, has 10 ports.

Who operates Fremont Motor Rawlins?

Fremont Motor Rawlins is listed as non-networked: its chargers are not run through a charging-network account. Wyoming has 36 non-networked stations, 26% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 12, 2025, one of 25 stations in Wyoming with a 2025 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Fremont Motor Rawlins have?

Fremont Motor Rawlins has 1 charging port: 1 Level 2.

Does Fremont Motor Rawlins have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Fremont Motor Rawlins have?

Fremont Motor Rawlins has J1772 connectors.

Is charging at Fremont Motor Rawlins free?

Pricing as reported to the DOE registry: Free.

Is Fremont Motor Rawlins open to the public?

Yes. Fremont Motor Rawlins is listed with public access, and its status is available.

Where is Fremont Motor Rawlins?

Fremont Motor Rawlins is at 823 E Cedar St, Rawlins, WY 82301. Its coordinates are 41.79065, -107.22831.

More EV charging around Rawlins

Working with Wyoming charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 422181, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Fremont Motor Rawlins, Rawlins, WY (AFDC station 422181)”, https://chargecensus.com/stations/wyoming/fremont-motor-rawlins-422181 (data as of October 12, 2026).