ChargeCensus

Wheelers Chevrolet of Medford

Available

EV charging station in Medford, Wisconsin on the FLO network — 1 DC fast. US DOE AFDC station 310772.

At a glance

Wheelers Chevrolet of Medford is a public EV charging station at 704 N 8th Street in Medford, Wisconsin, on the FLO network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Sep 15, 2023.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID310772
NetworkFLO
StatusAvailable (E)
AccessPublic
Open dateSep 15, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

FLO

Operates 1,246 stations in the DOE registry — view the full network →

Location

Address
704 N 8th Street
City
Medford
ZIP
54451
Coordinates
45.14794, -90.33378

Within ~15 km

Nearby charging

What kind of charging does Wheelers Chevrolet of Medford offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Wheelers Chevrolet of Medford compare with other stations in Medford?

Medford has 5 charging stations in the DOE registry with 9 ports. Wheelers Chevrolet of Medford accounts for 11% of the charging ports in Medford. FLO runs 4 stations in Medford. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Wheelers Chevrolet of Medford?

FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 22 of those stations are in Wisconsin, 2% of the state's 946.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 15, 2023, one of 117 stations in Wisconsin with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wheelers Chevrolet of Medford have?

Wheelers Chevrolet of Medford has 1 charging port: 1 DC fast.

Does Wheelers Chevrolet of Medford have DC fast charging?

Yes. The registry lists 1 DC fast port at Wheelers Chevrolet of Medford, with CHAdeMO and CCS connectors.

What connectors does Wheelers Chevrolet of Medford have?

Wheelers Chevrolet of Medford has CHAdeMO and CCS connectors.

Is Wheelers Chevrolet of Medford open to the public?

Yes. Wheelers Chevrolet of Medford is listed with public access, and its status is available.

Where is Wheelers Chevrolet of Medford?

Wheelers Chevrolet of Medford is at 704 N 8th Street, Medford, WI 54451. Its coordinates are 45.14794, -90.33378.

More EV charging around Medford

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 310772, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wheelers Chevrolet of Medford, Medford, WI (AFDC station 310772)”, https://chargecensus.com/stations/wisconsin/wheelers-chevrolet-of-medford-310772 (data as of October 12, 2026).