ChargeCensus

Wcsd Bethel Front

Available

EV charging station in Waunakee, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 429653.

At a glance

Wcsd Bethel Front is a public EV charging station at 905 Bethel Circle in Waunakee, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 10, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID429653
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 10, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
905 Bethel Circle
City
Waunakee
ZIP
53597
Coordinates
43.18045, -89.43536

Within ~15 km

Nearby charging

What kind of charging does Wcsd Bethel Front offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wcsd Bethel Front compare with other stations in Waunakee?

Waunakee has 8 charging stations in the DOE registry with 16 ports, the 24th-most of 208 cities and towns in Wisconsin. Wcsd Bethel Front accounts for 13% of the charging ports in Waunakee. ChargePoint runs 8 stations in Waunakee. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Wcsd Bethel Front?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 10, 2025, one of 165 stations in Wisconsin with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wcsd Bethel Front have?

Wcsd Bethel Front has 2 charging ports: 2 Level 2.

Does Wcsd Bethel Front have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wcsd Bethel Front have?

Wcsd Bethel Front has J1772 connectors.

Is Wcsd Bethel Front open to the public?

Yes. Wcsd Bethel Front is listed with public access, and its status is available.

Where is Wcsd Bethel Front?

Wcsd Bethel Front is at 905 Bethel Circle, Waunakee, WI 53597. Its coordinates are 43.18045, -89.43536.

More EV charging around Waunakee

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 429653, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wcsd Bethel Front, Waunakee, WI (AFDC station 429653)”, https://chargecensus.com/stations/wisconsin/wcsd-bethel-front-429653 (data as of October 12, 2026).