Vino in the Valley
AvailableEV charging station in Maiden Rock, Wisconsin on the ZEF Energy network — 2 Level 2. US DOE AFDC station 332349.
At a glance
Vino in the Valley is a public EV charging station at null W3826 450th Avenue in Maiden Rock, Wisconsin, on the ZEF Energy network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 332349 |
| Network | ZEF Energy |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- null W3826 450th Avenue
- City
- Maiden Rock
- State
- Wisconsin
- ZIP
- 54750
- Coordinates
- 44.69621, -92.32513
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Vino in the Valley offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vino in the Valley compare with other stations in Maiden Rock?
Maiden Rock has 1 charging station in the DOE registry with 2 ports. It is the only ZEF Energy station in Maiden Rock. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Vino in the Valley?
ZEF Energy operates 297 stations in the registry across 24 states, with 208 DC fast and 600 Level 2 ports in total. 25 of those stations are in Wisconsin, 3% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 16, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vino in the Valley have?
Vino in the Valley has 2 charging ports: 2 Level 2.
Does Vino in the Valley have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vino in the Valley have?
Vino in the Valley has J1772 connectors.
Is Vino in the Valley open to the public?
Yes. Vino in the Valley is listed with public access, and its status is available.
Where is Vino in the Valley?
Vino in the Valley is at null W3826 450th Avenue, Maiden Rock, WI 54750. Its coordinates are 44.69621, -92.32513.
More EV charging around Maiden Rock
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 332349, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vino in the Valley, Maiden Rock, WI (AFDC station 332349)”, https://chargecensus.com/stations/wisconsin/vino-in-the-valley-332349 (data as of October 12, 2026).