ChargeCensus

Uw-Stout Sorenson 2

Available

EV charging station in Menomonie, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 391539.

At a glance

Uw-Stout Sorenson 2 is a public EV charging station at 121 10th Ave E in Menomonie, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 1, 2025.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID391539
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 1, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
121 10th Ave E
City
Menomonie
ZIP
54751
Coordinates
44.87434, -91.92893

Within ~15 km

Nearby charging

What kind of charging does Uw-Stout Sorenson 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Uw-Stout Sorenson 2 compare with other stations in Menomonie?

Menomonie has 6 charging stations in the DOE registry with 19 ports. Uw-Stout Sorenson 2 accounts for 11% of the charging ports in Menomonie. ChargePoint runs 2 stations in Menomonie. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Uw-Stout Sorenson 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 1, 2025, one of 165 stations in Wisconsin with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Uw-Stout Sorenson 2 have?

Uw-Stout Sorenson 2 has 2 charging ports: 2 Level 2.

Does Uw-Stout Sorenson 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Uw-Stout Sorenson 2 have?

Uw-Stout Sorenson 2 has J1772 connectors.

Is Uw-Stout Sorenson 2 open to the public?

Yes. Uw-Stout Sorenson 2 is listed with public access, and its status is available.

Where is Uw-Stout Sorenson 2?

Uw-Stout Sorenson 2 is at 121 10th Ave E, Menomonie, WI 54751. Its coordinates are 44.87434, -91.92893.

More EV charging around Menomonie

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 391539, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Uw-Stout Sorenson 2, Menomonie, WI (AFDC station 391539)”, https://chargecensus.com/stations/wisconsin/uw-stout-sorenson-2-391539 (data as of October 12, 2026).