S & A Chargers 92nd & Lincoln
AvailableEV charging station in West Allis, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 307111.
At a glance
S & A Chargers 92nd & Lincoln is a public EV charging station at 9127 W Lincoln Ave in West Allis, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 16, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 307111 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 16, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 9127 W Lincoln Ave
- City
- West Allis
- State
- Wisconsin
- ZIP
- 53227
- Coordinates
- 43.00260, -88.02692
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
- Rockwell Automation11 ports
Blink · Available
- Fleet Farm Muskego10 ports
Blink · Available
Electrify America · Available
What kind of charging does S & A Chargers 92nd & Lincoln offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does S & A Chargers 92nd & Lincoln compare with other stations in West Allis?
West Allis has 7 charging stations in the DOE registry with 17 ports. S & A Chargers 92nd & Lincoln accounts for 12% of the charging ports in West Allis. ChargePoint runs 4 stations in West Allis. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates S & A Chargers 92nd & Lincoln?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 16, 2023, one of 117 stations in Wisconsin with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does S & A Chargers 92nd & Lincoln have?
S & A Chargers 92nd & Lincoln has 2 charging ports: 2 Level 2.
Does S & A Chargers 92nd & Lincoln have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does S & A Chargers 92nd & Lincoln have?
S & A Chargers 92nd & Lincoln has J1772 connectors.
Is S & A Chargers 92nd & Lincoln open to the public?
Yes. S & A Chargers 92nd & Lincoln is listed with public access, and its status is available.
Where is S & A Chargers 92nd & Lincoln?
S & A Chargers 92nd & Lincoln is at 9127 W Lincoln Ave, West Allis, WI 53227. Its coordinates are 43.00260, -88.02692.
More EV charging around West Allis
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 307111, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “S & A Chargers 92nd & Lincoln, West Allis, WI (AFDC station 307111)”, https://chargecensus.com/stations/wisconsin/s-a-chargers-92nd-lincoln-307111 (data as of October 12, 2026).