Riverland Energy Cooperative Arcadia
AvailableEV charging station in Arcadia, Wisconsin on the ZEF Energy network — 2 Level 2. US DOE AFDC station 332397.
At a glance
Riverland Energy Cooperative Arcadia is a public EV charging station at null N28988 Wisconsin 93 Trunk in Arcadia, Wisconsin, on the ZEF Energy network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 332397 |
| Network | ZEF Energy |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- null N28988 Wisconsin 93 Trunk
- City
- Arcadia
- State
- Wisconsin
- ZIP
- 54612
- Coordinates
- 44.26086, -91.47040
Within ~15 km
Nearby charging
ChargePoint · Available
What kind of charging does Riverland Energy Cooperative Arcadia offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Riverland Energy Cooperative Arcadia compare with other stations in Arcadia?
Arcadia has 2 charging stations in the DOE registry with 4 ports. Riverland Energy Cooperative Arcadia accounts for 50% of the charging ports in Arcadia. It is the only ZEF Energy station in Arcadia. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Riverland Energy Cooperative Arcadia?
ZEF Energy operates 297 stations in the registry across 24 states, with 208 DC fast and 600 Level 2 ports in total. 25 of those stations are in Wisconsin, 3% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 16, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Riverland Energy Cooperative Arcadia have?
Riverland Energy Cooperative Arcadia has 2 charging ports: 2 Level 2.
Does Riverland Energy Cooperative Arcadia have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Riverland Energy Cooperative Arcadia have?
Riverland Energy Cooperative Arcadia has J1772 connectors.
Is Riverland Energy Cooperative Arcadia open to the public?
Yes. Riverland Energy Cooperative Arcadia is listed with public access, and its status is available.
Where is Riverland Energy Cooperative Arcadia?
Riverland Energy Cooperative Arcadia is at null N28988 Wisconsin 93 Trunk, Arcadia, WI 54612. Its coordinates are 44.26086, -91.47040.
More EV charging around Arcadia
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 332397, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Riverland Energy Cooperative Arcadia, Arcadia, WI (AFDC station 332397)”, https://chargecensus.com/stations/wisconsin/riverland-energy-cooperative-arcadia-332397 (data as of October 12, 2026).