River North Apt River North
AvailableEV charging station in Manitowoc, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 254454.
At a glance
River North Apt River North is a public EV charging station at 1000 River Point Drive in Manitowoc, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 23, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 254454 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 23, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1000 River Point Drive
- City
- Manitowoc
- State
- Wisconsin
- ZIP
- 54220
- Coordinates
- 44.09328, -87.66181
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Van Horn Dodge of Manitowoc2 ports
Non-networked · Available
- Manitowoc Manty_library2 ports
ChargePoint · Available
ChargePoint · Available
What kind of charging does River North Apt River North offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does River North Apt River North compare with other stations in Manitowoc?
Manitowoc has 5 charging stations in the DOE registry with 15 ports. River North Apt River North accounts for 13% of the charging ports in Manitowoc. ChargePoint runs 3 stations in Manitowoc. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates River North Apt River North?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 23, 2023, one of 117 stations in Wisconsin with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does River North Apt River North have?
River North Apt River North has 2 charging ports: 2 Level 2.
Does River North Apt River North have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does River North Apt River North have?
River North Apt River North has J1772 connectors.
Is River North Apt River North open to the public?
Yes. River North Apt River North is listed with public access, and its status is available.
Where is River North Apt River North?
River North Apt River North is at 1000 River Point Drive, Manitowoc, WI 54220. Its coordinates are 44.09328, -87.66181.
More EV charging around Manitowoc
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 254454, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “River North Apt River North, Manitowoc, WI (AFDC station 254454)”, https://chargecensus.com/stations/wisconsin/river-north-apt-river-north-254454 (data as of October 12, 2026).