Pischke Motors - West Salem
AvailableEV charging station in West Salem, Wisconsin on the Blink network — 2 DC fast. US DOE AFDC station 384694.
At a glance
Pischke Motors - West Salem is a public EV charging station at 1460 West City Highway 16 in West Salem, Wisconsin, on the Blink network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jan 17, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 384694 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 17, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1460 West City Highway 16
- City
- West Salem
- State
- Wisconsin
- ZIP
- 54669
- Coordinates
- 43.89984, -91.10377
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Destination · Available
Tesla Supercharger · Available
- Dahl Ford4 ports
Ford Charge · Available
- Kwik Trip #7624 ports
Kwik Charge · Available
- Kwik Trip #10484 ports
Kwik Charge · Available
What kind of charging does Pischke Motors - West Salem offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector.
How does Pischke Motors - West Salem compare with other stations in West Salem?
West Salem has 3 charging stations in the DOE registry with 7 ports. Pischke Motors - West Salem accounts for 29% of the charging ports in West Salem. It is the only Blink station in West Salem. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Pischke Motors - West Salem?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 93 of those stations are in Wisconsin, 10% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 17, 2025, one of 165 stations in Wisconsin with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Pischke Motors - West Salem have?
Pischke Motors - West Salem has 2 charging ports: 2 DC fast.
Does Pischke Motors - West Salem have DC fast charging?
Yes. The registry lists 2 DC fast ports at Pischke Motors - West Salem, with CCS connectors.
What connectors does Pischke Motors - West Salem have?
Pischke Motors - West Salem has CCS connectors.
Is Pischke Motors - West Salem open to the public?
Yes. Pischke Motors - West Salem is listed with public access, and its status is available.
Where is Pischke Motors - West Salem?
Pischke Motors - West Salem is at 1460 West City Highway 16, West Salem, WI 54669. Its coordinates are 43.89984, -91.10377.
More EV charging around West Salem
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 384694, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Pischke Motors - West Salem, West Salem, WI (AFDC station 384694)”, https://chargecensus.com/stations/wisconsin/pischke-motors-west-salem-384694 (data as of October 12, 2026).