Organic Valley Cob EV 1
AvailableEV charging station in Cashton, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 220484.
At a glance
Organic Valley Cob EV 1 is a public EV charging station at 509 Organic Dr in Cashton, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 3, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 220484 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 3, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 509 Organic Dr
- City
- Cashton
- State
- Wisconsin
- ZIP
- 54619
- Coordinates
- 43.72726, -90.80375
Within ~15 km
Nearby charging
- Vernon Electric Co-op2 ports
Non-networked · Available
- Organic Valley Cob EV 22 ports
ChargePoint · Available
What kind of charging does Organic Valley Cob EV 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Organic Valley Cob EV 1 compare with other stations in Cashton?
Cashton has 2 charging stations in the DOE registry with 4 ports. Organic Valley Cob EV 1 accounts for 50% of the charging ports in Cashton. ChargePoint runs 2 stations in Cashton. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Organic Valley Cob EV 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 3, 2022, one of 116 stations in Wisconsin with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Organic Valley Cob EV 1 have?
Organic Valley Cob EV 1 has 2 charging ports: 2 Level 2.
Does Organic Valley Cob EV 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Organic Valley Cob EV 1 have?
Organic Valley Cob EV 1 has J1772 connectors.
Is Organic Valley Cob EV 1 open to the public?
Yes. Organic Valley Cob EV 1 is listed with public access, and its status is available.
Where is Organic Valley Cob EV 1?
Organic Valley Cob EV 1 is at 509 Organic Dr, Cashton, WI 54619. Its coordinates are 43.72726, -90.80375.
More EV charging around Cashton
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 220484, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Organic Valley Cob EV 1, Cashton, WI (AFDC station 220484)”, https://chargecensus.com/stations/wisconsin/organic-valley-cob-ev-1-220484 (data as of October 12, 2026).