Miller Motor Sales - Level2
AvailableEV charging station in Burlington, Wisconsin on the Blink network — 2 Level 2. US DOE AFDC station 333603.
At a glance
Miller Motor Sales - Level2 is a public EV charging station at 1196 Milwaukee Avenue in Burlington, Wisconsin, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 16, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 333603 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 16, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1196 Milwaukee Avenue
- City
- Burlington
- State
- Wisconsin
- ZIP
- 53105
- Coordinates
- 42.69372, -88.26286
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Rooker Energy Solutions4 ports
Blink · Available
- Miller Motor Sales - DCFC2 ports
Blink · Available
- Lynch Chevrolet Buick GMC1 ports
EV Connect · Available
Tesla Destination · Available
What kind of charging does Miller Motor Sales - Level2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Miller Motor Sales - Level2 compare with other stations in Burlington?
Burlington has 3 charging stations in the DOE registry with 5 ports. Miller Motor Sales - Level2 accounts for 40% of the charging ports in Burlington. Blink runs 2 stations in Burlington. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Miller Motor Sales - Level2?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 93 of those stations are in Wisconsin, 10% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 16, 2023, one of 117 stations in Wisconsin with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Miller Motor Sales - Level2 have?
Miller Motor Sales - Level2 has 2 charging ports: 2 Level 2.
Does Miller Motor Sales - Level2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Miller Motor Sales - Level2 have?
Miller Motor Sales - Level2 has J1772 connectors.
Is Miller Motor Sales - Level2 open to the public?
Yes. Miller Motor Sales - Level2 is listed with public access, and its status is available.
Where is Miller Motor Sales - Level2?
Miller Motor Sales - Level2 is at 1196 Milwaukee Avenue, Burlington, WI 53105. Its coordinates are 42.69372, -88.26286.
More EV charging around Burlington
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 333603, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Miller Motor Sales - Level2, Burlington, WI (AFDC station 333603)”, https://chargecensus.com/stations/wisconsin/miller-motor-sales-level2-333603 (data as of October 12, 2026).