Larsen Orchard Main Lot 002
AvailableEV charging station in Hobart, Wisconsin on the ChargePoint network — 1 Level 2. US DOE AFDC station 457511.
At a glance
Larsen Orchard Main Lot 002 is a public EV charging station at 582 Larsen Orch Pkwy in Hobart, Wisconsin, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 11, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 457511 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 11, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 582 Larsen Orch Pkwy
- City
- Hobart
- State
- Wisconsin
- ZIP
- 54155
- Coordinates
- 44.56933, -88.16624
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Witt Family Ford8 ports
Synergev · Available
- Meijer #298 (Howard, WI)6 ports
Electrify America · Available
- Bergstrom Ford of Green Bay4 ports
Ford Charge · Available
ChargePoint · Available
- Aloft Green Bay2 ports
EnviroSpark · Available
What kind of charging does Larsen Orchard Main Lot 002 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Larsen Orchard Main Lot 002 compare with other stations in Hobart?
Hobart has 4 charging stations in the DOE registry with 4 ports. Larsen Orchard Main Lot 002 accounts for 25% of the charging ports in Hobart. ChargePoint runs 4 stations in Hobart. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Larsen Orchard Main Lot 002?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 11, 2026, one of 121 stations in Wisconsin with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Larsen Orchard Main Lot 002 have?
Larsen Orchard Main Lot 002 has 1 charging port: 1 Level 2.
Does Larsen Orchard Main Lot 002 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Larsen Orchard Main Lot 002 have?
Larsen Orchard Main Lot 002 has J1772 connectors.
Is Larsen Orchard Main Lot 002 open to the public?
Yes. Larsen Orchard Main Lot 002 is listed with public access, and its status is available.
Where is Larsen Orchard Main Lot 002?
Larsen Orchard Main Lot 002 is at 582 Larsen Orch Pkwy, Hobart, WI 54155. Its coordinates are 44.56933, -88.16624.
More EV charging around Hobart
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 457511, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Larsen Orchard Main Lot 002, Hobart, WI (AFDC station 457511)”, https://chargecensus.com/stations/wisconsin/larsen-orchard-main-lot-002-457511 (data as of October 12, 2026).