ChargeCensus

Evergreen Credit Union

Available

EV charging station in Neenah, Wisconsin, not on a charging network — 1 Level 2. US DOE AFDC station 123640.

At a glance

Evergreen Credit Union is a public EV charging station at 1500 W American Dr in Neenah, Wisconsin, not attached to a charging network. It has 1 charging port (1 Level 2) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since Dec 1, 2018.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID123640
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityBank
Open dateDec 1, 2018
Last updated at sourceFeb 12, 2025

Plugs

Connectors & pricing

  • NACS (Tesla) — The North American Charging Standard connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
1500 W American Dr
City
Neenah
ZIP
54956
Coordinates
44.22270, -88.49725

Within ~15 km

Nearby charging

What kind of charging does Evergreen Credit Union offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “Free”. The site is listed as a bank location.

How does Evergreen Credit Union compare with other stations in Neenah?

Neenah has 5 charging stations in the DOE registry with 15 ports. Evergreen Credit Union accounts for 7% of the charging ports in Neenah. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Evergreen Credit Union?

Evergreen Credit Union is listed as non-networked: its chargers are not run through a charging-network account. Wisconsin has 73 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 1, 2018, one of 14 stations in Wisconsin with a 2018 open date. The station's record was last updated at the source on Feb 12, 2025.

Frequently asked questions

How many chargers does Evergreen Credit Union have?

Evergreen Credit Union has 1 charging port: 1 Level 2.

Does Evergreen Credit Union have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Evergreen Credit Union have?

Evergreen Credit Union has NACS (Tesla) connectors.

Is charging at Evergreen Credit Union free?

Pricing as reported to the DOE registry: Free.

Is Evergreen Credit Union open to the public?

Yes. Evergreen Credit Union is listed with public access, and its status is available.

Where is Evergreen Credit Union?

Evergreen Credit Union is at 1500 W American Dr, Neenah, WI 54956. Its coordinates are 44.22270, -88.49725.

More EV charging around Neenah

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 123640, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Evergreen Credit Union, Neenah, WI (AFDC station 123640)”, https://chargecensus.com/stations/wisconsin/evergreen-credit-union-123640 (data as of October 12, 2026).