Evansville Maple St Lot
AvailableEV charging station in Evansville, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 220417.
At a glance
Evansville Maple St Lot is a public EV charging station at 21 Maple Street in Evansville, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 2, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 220417 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 2, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 21 Maple Street
- City
- Evansville
- State
- Wisconsin
- ZIP
- 53536
- Coordinates
- 42.77962, -89.29824
Within ~15 km
Nearby charging
- Evansville Ford6 ports
Blink · Available
Non-networked · Available
- Greenspire Jolt2 ports
ChargePoint · Available
- Greenspire Joule2 ports
ChargePoint · Available
- Greenspire Zappy2 ports
ChargePoint · Available
- Greenspire Funphoton2 ports
ChargePoint · Available
What kind of charging does Evansville Maple St Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Evansville Maple St Lot compare with other stations in Evansville?
Evansville has 2 charging stations in the DOE registry with 8 ports. Evansville Maple St Lot accounts for 25% of the charging ports in Evansville. It is the only ChargePoint station in Evansville. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Evansville Maple St Lot?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 2, 2022, one of 116 stations in Wisconsin with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Evansville Maple St Lot have?
Evansville Maple St Lot has 2 charging ports: 2 Level 2.
Does Evansville Maple St Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Evansville Maple St Lot have?
Evansville Maple St Lot has J1772 connectors.
Is Evansville Maple St Lot open to the public?
Yes. Evansville Maple St Lot is listed with public access, and its status is available.
Where is Evansville Maple St Lot?
Evansville Maple St Lot is at 21 Maple Street, Evansville, WI 53536. Its coordinates are 42.77962, -89.29824.
More EV charging around Evansville
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 220417, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Evansville Maple St Lot, Evansville, WI (AFDC station 220417)”, https://chargecensus.com/stations/wisconsin/evansville-maple-st-lot-220417 (data as of October 12, 2026).