Dahlke Landing
AvailableEV charging station in Westfield, Wisconsin on the FLO network — 2 Level 2. US DOE AFDC station 361316.
At a glance
Dahlke Landing is a public EV charging station at 104 North Main St in Westfield, Wisconsin, on the FLO network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 2, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 361316 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 2, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 104 North Main St
- City
- Westfield
- State
- Wisconsin
- ZIP
- 53964
- Coordinates
- 43.53128, -89.29397
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Dahlke Landing offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dahlke Landing compare with other stations in Westfield?
Westfield has 3 charging stations in the DOE registry with 8 ports. Dahlke Landing accounts for 25% of the charging ports in Westfield. FLO runs 3 stations in Westfield. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Dahlke Landing?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 22 of those stations are in Wisconsin, 2% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 2, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dahlke Landing have?
Dahlke Landing has 2 charging ports: 2 Level 2.
Does Dahlke Landing have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dahlke Landing have?
Dahlke Landing has J1772 connectors.
Is Dahlke Landing open to the public?
Yes. Dahlke Landing is listed with public access, and its status is available.
Where is Dahlke Landing?
Dahlke Landing is at 104 North Main St, Westfield, WI 53964. Its coordinates are 43.53128, -89.29397.
More EV charging around Westfield
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 361316, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dahlke Landing, Westfield, WI (AFDC station 361316)”, https://chargecensus.com/stations/wisconsin/dahlke-landing-361316 (data as of October 12, 2026).