Central Wisconsin Electric Co-op

Available

EV charging station in Rosholt, Wisconsin, not on a charging network — 1 Level 2. US DOE AFDC station 185012.

At a glance

Central Wisconsin Electric Co-op is a public EV charging station at 10401 Lystul Rd in Rosholt, Wisconsin, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 8, 2021.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID185012
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityUtility
Open dateFeb 8, 2021
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
10401 Lystul Rd
City
Rosholt
ZIP
54473
Coordinates
44.65181, -89.26318

Within ~15 km

Nearby charging

What kind of charging does Central Wisconsin Electric Co-op offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a utility location.

How does Central Wisconsin Electric Co-op compare with other stations in Rosholt?

Rosholt has 1 charging station in the DOE registry with 1 ports. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates Central Wisconsin Electric Co-op?

Central Wisconsin Electric Co-op is listed as non-networked: its chargers are not run through a charging-network account. Wisconsin has 73 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 8, 2021, one of 86 stations in Wisconsin with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does Central Wisconsin Electric Co-op have?

Central Wisconsin Electric Co-op has 1 charging port: 1 Level 2.

Does Central Wisconsin Electric Co-op have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Central Wisconsin Electric Co-op have?

Central Wisconsin Electric Co-op has J1772 connectors.

Is charging at Central Wisconsin Electric Co-op free?

Pricing as reported to the DOE registry: Free.

Is Central Wisconsin Electric Co-op open to the public?

Yes. Central Wisconsin Electric Co-op is listed with public access, and its status is available.

Where is Central Wisconsin Electric Co-op?

Central Wisconsin Electric Co-op is at 10401 Lystul Rd, Rosholt, WI 54473. Its coordinates are 44.65181, -89.26318.

More EV charging around Rosholt

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 185012, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Central Wisconsin Electric Co-op, Rosholt, WI (AFDC station 185012)”, https://chargecensus.com/stations/wisconsin/central-wisconsin-electric-co-op-185012 (data as of October 12, 2026).