Barron Electric Cooperative - Spooner Office
AvailableEV charging station in Spooner, Wisconsin on the ZEF Energy network — 1 Level 2. US DOE AFDC station 332389.
At a glance
Barron Electric Cooperative - Spooner Office is a public EV charging station at 1550 Paulson Drive in Spooner, Wisconsin, on the ZEF Energy network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 332389 |
| Network | ZEF Energy |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1550 Paulson Drive
- City
- Spooner
- State
- Wisconsin
- ZIP
- 54801
- Coordinates
- 45.82972, -91.86899
Within ~15 km
Nearby charging
- Prime Bar Family Dining3 ports
ZEF Energy · Available
ChargePoint · Available
What kind of charging does Barron Electric Cooperative - Spooner Office offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 63% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Barron Electric Cooperative - Spooner Office compare with other stations in Spooner?
Spooner has 2 charging stations in the DOE registry with 3 ports. Barron Electric Cooperative - Spooner Office accounts for 33% of the charging ports in Spooner. It is the only ZEF Energy station in Spooner. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.
Who operates Barron Electric Cooperative - Spooner Office?
ZEF Energy operates 297 stations in the registry across 24 states, with 208 DC fast and 600 Level 2 ports in total. 25 of those stations are in Wisconsin, 3% of the state's 946.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 16, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Barron Electric Cooperative - Spooner Office have?
Barron Electric Cooperative - Spooner Office has 1 charging port: 1 Level 2.
Does Barron Electric Cooperative - Spooner Office have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Barron Electric Cooperative - Spooner Office have?
Barron Electric Cooperative - Spooner Office has J1772 connectors.
Is Barron Electric Cooperative - Spooner Office open to the public?
Yes. Barron Electric Cooperative - Spooner Office is listed with public access, and its status is available.
Where is Barron Electric Cooperative - Spooner Office?
Barron Electric Cooperative - Spooner Office is at 1550 Paulson Drive, Spooner, WI 54801. Its coordinates are 45.82972, -91.86899.
More EV charging around Spooner
Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 332389, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Barron Electric Cooperative - Spooner Office, Spooner, WI (AFDC station 332389)”, https://chargecensus.com/stations/wisconsin/barron-electric-cooperative-spooner-office-332389 (data as of October 12, 2026).