ChargeCensus

American Birkebeiner Trailhead

Available

EV charging station in Cable, Wisconsin, not on a charging network — 2 Level 2. US DOE AFDC station 185016.

At a glance

American Birkebeiner Trailhead is a public EV charging station at 14875 McNaught Rd in Cable, Wisconsin, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 8, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID185016
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityRec Sports Facility
Open dateFeb 8, 2021
Last updated at sourceFeb 2, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
14875 McNaught Rd
City
Cable
ZIP
54821
Coordinates
46.19358, -91.25770

Within ~15 km

Nearby charging

What kind of charging does American Birkebeiner Trailhead offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a rec sports facility location.

How does American Birkebeiner Trailhead compare with other stations in Cable?

Cable has 2 charging stations in the DOE registry with 4 ports. American Birkebeiner Trailhead accounts for 50% of the charging ports in Cable. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates American Birkebeiner Trailhead?

American Birkebeiner Trailhead is listed as non-networked: its chargers are not run through a charging-network account. Wisconsin has 73 non-networked stations, 8% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 8, 2021, one of 86 stations in Wisconsin with a 2021 open date. The station's record was last updated at the source on Feb 2, 2026.

Frequently asked questions

How many chargers does American Birkebeiner Trailhead have?

American Birkebeiner Trailhead has 2 charging ports: 2 Level 2.

Does American Birkebeiner Trailhead have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does American Birkebeiner Trailhead have?

American Birkebeiner Trailhead has J1772 connectors.

Is charging at American Birkebeiner Trailhead free?

Pricing as reported to the DOE registry: Free.

Is American Birkebeiner Trailhead open to the public?

Yes. American Birkebeiner Trailhead is listed with public access, and its status is available.

Where is American Birkebeiner Trailhead?

American Birkebeiner Trailhead is at 14875 McNaught Rd, Cable, WI 54821. Its coordinates are 46.19358, -91.25770.

More EV charging around Cable

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 185016, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “American Birkebeiner Trailhead, Cable, WI (AFDC station 185016)”, https://chargecensus.com/stations/wisconsin/american-birkebeiner-trailhead-185016 (data as of October 12, 2026).