ChargeCensus

123 S Second Municipal Bldg

Available

EV charging station in Delavan, Wisconsin on the ChargePoint network — 2 Level 2. US DOE AFDC station 347170.

At a glance

123 S Second Municipal Bldg is a public EV charging station at 129 S 2nd St in Delavan, Wisconsin, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 31, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID347170
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 31, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
129 S 2nd St
City
Delavan
ZIP
53115
Coordinates
42.63158, -88.64649

Within ~15 km

Nearby charging

What kind of charging does 123 S Second Municipal Bldg offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 26% below the Wisconsin average of 2.7 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does 123 S Second Municipal Bldg compare with other stations in Delavan?

Delavan has 6 charging stations in the DOE registry with 13 ports. 123 S Second Municipal Bldg accounts for 15% of the charging ports in Delavan. It is the only ChargePoint station in Delavan. Statewide, Wisconsin has 946 stations and 2,570 ports, the 24th-largest station count of the 51 states and DC. The biggest station in Wisconsin, To Be Installed [TBD - City of Madison] in Madison, has 31 ports.

Who operates 123 S Second Municipal Bldg?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 461 of those stations are in Wisconsin, 49% of the state's 946.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 31, 2024, one of 170 stations in Wisconsin with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does 123 S Second Municipal Bldg have?

123 S Second Municipal Bldg has 2 charging ports: 2 Level 2.

Does 123 S Second Municipal Bldg have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does 123 S Second Municipal Bldg have?

123 S Second Municipal Bldg has J1772 connectors.

Is 123 S Second Municipal Bldg open to the public?

Yes. 123 S Second Municipal Bldg is listed with public access, and its status is available.

Where is 123 S Second Municipal Bldg?

123 S Second Municipal Bldg is at 129 S 2nd St, Delavan, WI 53115. Its coordinates are 42.63158, -88.64649.

More EV charging around Delavan

Working with Wisconsin charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 347170, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “123 S Second Municipal Bldg, Delavan, WI (AFDC station 347170)”, https://chargecensus.com/stations/wisconsin/123-s-second-municipal-bldg-347170 (data as of October 12, 2026).