ChargeCensus

The Landing at Meadow View

Available

EV charging station in Bridgeport, West Virginia on the Blink network — 2 Level 2. US DOE AFDC station 380508.

At a glance

The Landing at Meadow View is a public EV charging station at 600 Barley Court in Bridgeport, West Virginia, on the Blink network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 14, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID380508
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateJul 14, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
600 Barley Court
City
Bridgeport
ZIP
26330
Coordinates
39.29392, -80.24567

Within ~15 km

Nearby charging

What kind of charging does The Landing at Meadow View offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 32% below the West Virginia average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does The Landing at Meadow View compare with other stations in Bridgeport?

Bridgeport has 3 charging stations in the DOE registry with 7 ports, the 22nd-most of 80 cities and towns in West Virginia. The Landing at Meadow View accounts for 29% of the charging ports in Bridgeport. It is the only Blink station in Bridgeport. Statewide, West Virginia has 211 stations and 624 ports, the 46th-largest station count of the 51 states and DC. The biggest station in West Virginia, American Public University in Charles Town, has 14 ports.

Who operates The Landing at Meadow View?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 30 of those stations are in West Virginia, 14% of the state's 211.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 14, 2023, one of 18 stations in West Virginia with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Landing at Meadow View have?

The Landing at Meadow View has 2 charging ports: 2 Level 2.

Does The Landing at Meadow View have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does The Landing at Meadow View have?

The Landing at Meadow View has J1772 connectors.

Is The Landing at Meadow View open to the public?

Yes. The Landing at Meadow View is listed with public access, and its status is available.

Where is The Landing at Meadow View?

The Landing at Meadow View is at 600 Barley Court, Bridgeport, WV 26330. Its coordinates are 39.29392, -80.24567.

More EV charging around Bridgeport

Working with West Virginia charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 380508, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Landing at Meadow View, Bridgeport, WV (AFDC station 380508)”, https://chargecensus.com/stations/west-virginia/the-landing-at-meadow-view-380508 (data as of October 12, 2026).