Waterfrontplc P2
AvailableEV charging station in Kirkland, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 451809.
At a glance
Waterfrontplc P2 is a public EV charging station at 5209 Lake Washington Boulevard Northeast in Kirkland, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 24, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 451809 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 24, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 5209 Lake Washington Boulevard Northeast
- City
- Kirkland
- State
- Washington
- ZIP
- 98033
- Coordinates
- 47.65435, -122.20583
Within ~15 km
Nearby charging
- 145th Shoreline MUR-70102 ports
OpConnect · Available
- Google52 ports
ChargePoint · Available
- City of Seattle - Muni Tower32 ports
Non-networked · Available
- Alexan Shoreline28 ports
OpConnect · Planned
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
What kind of charging does Waterfrontplc P2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Waterfrontplc P2 compare with other stations in Kirkland?
Kirkland has 67 charging stations in the DOE registry with 294 ports, the 9th-most of 244 cities and towns in Washington. Waterfrontplc P2 accounts for under 1% of the charging ports in Kirkland. ChargePoint runs 41 stations in Kirkland. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Waterfrontplc P2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 24, 2026, one of 657 stations in Washington with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Waterfrontplc P2 have?
Waterfrontplc P2 has 2 charging ports: 2 Level 2.
Does Waterfrontplc P2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Waterfrontplc P2 have?
Waterfrontplc P2 has J1772 connectors.
Is Waterfrontplc P2 open to the public?
Yes. Waterfrontplc P2 is listed with public access, and its status is available.
Where is Waterfrontplc P2?
Waterfrontplc P2 is at 5209 Lake Washington Boulevard Northeast, Kirkland, WA 98033. Its coordinates are 47.65435, -122.20583.
More EV charging around Kirkland
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 451809, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Waterfrontplc P2, Kirkland, WA (AFDC station 451809)”, https://chargecensus.com/stations/washington/waterfrontplc-p2-451809 (data as of October 12, 2026).