Villasarlington Station 1
AvailableEV charging station in Arlington, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 251764.
At a glance
Villasarlington Station 1 is a public EV charging station at 3328 185th Pl NE in Arlington, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 25, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 251764 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 25, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3328 185th Pl NE
- City
- Arlington
- State
- Washington
- ZIP
- 98223
- Coordinates
- 48.16404, -122.18436
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Kendall Ford of Marysville13 ports
Blink · Available
Tesla Supercharger · Available
- Vintage at Soper Hill12 ports
Noodoe · Available
- Walmart EV Charging8 ports
Walmart · Available
- Walmart EV Charging8 ports
Walmart · Available
What kind of charging does Villasarlington Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Villasarlington Station 1 compare with other stations in Arlington?
Arlington has 20 charging stations in the DOE registry with 67 ports. Villasarlington Station 1 accounts for 3% of the charging ports in Arlington. ChargePoint runs 15 stations in Arlington. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Villasarlington Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 25, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Villasarlington Station 1 have?
Villasarlington Station 1 has 2 charging ports: 2 Level 2.
Does Villasarlington Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Villasarlington Station 1 have?
Villasarlington Station 1 has J1772 connectors.
Is Villasarlington Station 1 open to the public?
Yes. Villasarlington Station 1 is listed with public access, and its status is available.
Where is Villasarlington Station 1?
Villasarlington Station 1 is at 3328 185th Pl NE, Arlington, WA 98223. Its coordinates are 48.16404, -122.18436.
More EV charging around Arlington
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 251764, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Villasarlington Station 1, Arlington, WA (AFDC station 251764)”, https://chargecensus.com/stations/washington/villasarlington-station-1-251764 (data as of October 12, 2026).