ChargeCensus

Uwb Cascadia Cc Truly House #1

Available

EV charging station in Bothell, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 70092.

At a glance

Uwb Cascadia Cc Truly House #1 is a public EV charging station at 18140 Campus Way NE in Bothell, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 29, 2015.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID70092
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateSep 29, 2015
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
18140 Campus Way NE
ZIP
98011
Coordinates
47.75950, -122.19307

Within ~15 km

Nearby charging

What kind of charging does Uwb Cascadia Cc Truly House #1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Uwb Cascadia Cc Truly House #1 compare with other stations in Bothell?

Bothell has 31 charging stations in the DOE registry with 100 ports, the 22nd-most of 244 cities and towns in Washington. Uwb Cascadia Cc Truly House #1 accounts for 2% of the charging ports in Bothell. ChargePoint runs 20 stations in Bothell. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Uwb Cascadia Cc Truly House #1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 29, 2015, one of 47 stations in Washington with a 2015 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Uwb Cascadia Cc Truly House #1 have?

Uwb Cascadia Cc Truly House #1 has 2 charging ports: 2 Level 2.

Does Uwb Cascadia Cc Truly House #1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Uwb Cascadia Cc Truly House #1 have?

Uwb Cascadia Cc Truly House #1 has J1772 connectors.

Is Uwb Cascadia Cc Truly House #1 open to the public?

Yes. Uwb Cascadia Cc Truly House #1 is listed with public access, and its status is available.

Where is Uwb Cascadia Cc Truly House #1?

Uwb Cascadia Cc Truly House #1 is at 18140 Campus Way NE, Bothell, WA 98011. Its coordinates are 47.75950, -122.19307.

More EV charging around Bothell

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 70092, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Uwb Cascadia Cc Truly House #1, Bothell, WA (AFDC station 70092)”, https://chargecensus.com/stations/washington/uwb-cascadia-cc-truly-house-1-70092 (data as of October 12, 2026).