The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey
Temporarily unavailableEV charging station in Lacey, Washington on the EV Connect network — 2 DC fast · 4 Level 2. US DOE AFDC station 166926.
At a glance
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is a public EV charging station at 676 Woodland Square Loop SE in Lacey, Washington, on the EV Connect network. It has 6 charging ports (2 DC fast · 4 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as temporarily unavailable, open since Sep 18, 2020.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 166926 |
| Network | EV Connect |
| Status | Temporarily unavailable (T) |
| Access | Public |
| Open date | Sep 18, 2020 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 676 Woodland Square Loop SE
- City
- Lacey
- State
- Washington
- ZIP
- 98503
- Coordinates
- 47.04183, -122.82528
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Imber at Union Mills13 ports
Blink · Available
- Lacey, WA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Mullinax Ford of Olympia9 ports
Synergev · Available
Tesla Supercharger · Available
- MultiCare Olympia, WA7 ports
Blink · Available
What kind of charging does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey offer?
Of its 6 ports, 2 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about twice the Washington average of 3 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey compare with other stations in Lacey?
Lacey has 50 charging stations in the DOE registry with 116 ports, the 11th-most of 244 cities and towns in Washington. The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey accounts for 5% of the charging ports in Lacey. It is the only EV Connect station in Lacey. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 94 of those stations are in Washington, 3% of the state's 3,447.
What does the “Temporarily unavailable” status mean?
“Temporarily unavailable” means the station exists but is reported as temporarily out of service. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2020, one of 130 stations in Washington with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey have?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey has 6 charging ports: 2 DC fast · 4 Level 2.
Does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey have DC fast charging?
Yes. The registry lists 2 DC fast ports at The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey, with CHAdeMO and CCS connectors.
What connectors does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey have?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey has CHAdeMO, J1772 and CCS connectors.
Is The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey open to the public?
Yes. The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is listed with public access, and its status is temporarily unavailable.
Where is The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is at 676 Woodland Square Loop SE, Lacey, WA 98503. Its coordinates are 47.04183, -122.82528.
More EV charging around Lacey
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 166926, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey, Lacey, WA (AFDC station 166926)”, https://chargecensus.com/stations/washington/the-hub-at-lacey-office-space-676-woodland-square-loop-se-lacey-166926 (data as of October 12, 2026).