ChargeCensus

Sound Transit Tukwila 2

Available

EV charging station in Tukwila, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 165509.

At a glance

Sound Transit Tukwila 2 is a public EV charging station at 7301 Longacres Way in Tukwila, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 26, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID165509
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 26, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
7301 Longacres Way
ZIP
98188
Coordinates
47.46019, -122.24075

Within ~15 km

Nearby charging

What kind of charging does Sound Transit Tukwila 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Sound Transit Tukwila 2 compare with other stations in Tukwila?

Tukwila has 26 charging stations in the DOE registry with 105 ports. Sound Transit Tukwila 2 accounts for 2% of the charging ports in Tukwila. ChargePoint runs 13 stations in Tukwila. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Sound Transit Tukwila 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 26, 2020, one of 130 stations in Washington with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Sound Transit Tukwila 2 have?

Sound Transit Tukwila 2 has 2 charging ports: 2 Level 2.

Does Sound Transit Tukwila 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Sound Transit Tukwila 2 have?

Sound Transit Tukwila 2 has J1772 connectors.

Is Sound Transit Tukwila 2 open to the public?

Yes. Sound Transit Tukwila 2 is listed with public access, and its status is available.

Where is Sound Transit Tukwila 2?

Sound Transit Tukwila 2 is at 7301 Longacres Way, Tukwila, WA 98188. Its coordinates are 47.46019, -122.24075.

More EV charging around Tukwila

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 165509, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Sound Transit Tukwila 2, Tukwila, WA (AFDC station 165509)”, https://chargecensus.com/stations/washington/sound-transit-tukwila-2-165509 (data as of October 12, 2026).