Sammamish City Hall Lot 1
AvailableEV charging station in Sammamish, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 172912.
At a glance
Sammamish City Hall Lot 1 is a public EV charging station at 801 228th Ave SE in Sammamish, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 172912 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 801 228th Ave SE
- City
- Sammamish
- State
- Washington
- ZIP
- 98075
- Coordinates
- 47.60156, -122.03630
Within ~15 km
Nearby charging
Tesla Destination · Available
- AMLI Redmond Wy19 ports
Loop · Available
Blink · Available
Tesla Supercharger · Available
Blink · Available
Tesla Supercharger · Available
What kind of charging does Sammamish City Hall Lot 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Sammamish City Hall Lot 1 compare with other stations in Sammamish?
Sammamish has 10 charging stations in the DOE registry with 35 ports. Sammamish City Hall Lot 1 accounts for 6% of the charging ports in Sammamish. ChargePoint runs 6 stations in Sammamish. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Sammamish City Hall Lot 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 414 stations in Washington with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Sammamish City Hall Lot 1 have?
Sammamish City Hall Lot 1 has 2 charging ports: 2 Level 2.
Does Sammamish City Hall Lot 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Sammamish City Hall Lot 1 have?
Sammamish City Hall Lot 1 has J1772 connectors.
Is Sammamish City Hall Lot 1 open to the public?
Yes. Sammamish City Hall Lot 1 is listed with public access, and its status is available.
Where is Sammamish City Hall Lot 1?
Sammamish City Hall Lot 1 is at 801 228th Ave SE, Sammamish, WA 98075. Its coordinates are 47.60156, -122.03630.
More EV charging around Sammamish
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 172912, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Sammamish City Hall Lot 1, Sammamish, WA (AFDC station 172912)”, https://chargecensus.com/stations/washington/sammamish-city-hall-lot-1-172912 (data as of October 12, 2026).