Penmet Parks Hqev1-Single
AvailableEV charging station in Gig Harbor, Washington on the ChargePoint network — 1 Level 2. US DOE AFDC station 421236.
At a glance
Penmet Parks Hqev1-Single is a public EV charging station at 2416 14th Ave NW in Gig Harbor, Washington, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 30, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 421236 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 30, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2416 14th Ave NW
- City
- Gig Harbor
- State
- Washington
- ZIP
- 98335
- Coordinates
- 47.28129, -122.55865
Within ~15 km
Nearby charging
- Tacoma Power Lot D EV Charging20 ports
AmpUp · Available
- Tacoma Power Lot D EV Charging17 ports
ChargePoint · Available
Tesla Supercharger · Available
- The Lex14 ports
Blink · Available
Tesla Supercharger · Available
- Tacoma, WA - Tesla Supercharger12 ports
Tesla Supercharger · Available
What kind of charging does Penmet Parks Hqev1-Single offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Penmet Parks Hqev1-Single compare with other stations in Gig Harbor?
Gig Harbor has 17 charging stations in the DOE registry with 49 ports. Penmet Parks Hqev1-Single accounts for 2% of the charging ports in Gig Harbor. ChargePoint runs 11 stations in Gig Harbor. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Penmet Parks Hqev1-Single?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 30, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Penmet Parks Hqev1-Single have?
Penmet Parks Hqev1-Single has 1 charging port: 1 Level 2.
Does Penmet Parks Hqev1-Single have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Penmet Parks Hqev1-Single have?
Penmet Parks Hqev1-Single has J1772 connectors.
Is Penmet Parks Hqev1-Single open to the public?
Yes. Penmet Parks Hqev1-Single is listed with public access, and its status is available.
Where is Penmet Parks Hqev1-Single?
Penmet Parks Hqev1-Single is at 2416 14th Ave NW, Gig Harbor, WA 98335. Its coordinates are 47.28129, -122.55865.
More EV charging around Gig Harbor
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 421236, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Penmet Parks Hqev1-Single, Gig Harbor, WA (AFDC station 421236)”, https://chargecensus.com/stations/washington/penmet-parks-hqev1-single-421236 (data as of October 12, 2026).