Peak410 Peak410-6
AvailableEV charging station in Bonney Lake, Washington on the ChargePoint network — 1 Level 2. US DOE AFDC station 404669.
At a glance
Peak410 Peak410-6 is a public EV charging station at 22503 97th Street East in Bonney Lake, Washington, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 27, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 404669 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 27, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 22503 97th Street East
- City
- Bonney Lake
- State
- Washington
- ZIP
- 98391
- Coordinates
- 47.16686, -122.12776
Within ~15 km
Nearby charging
- Auburn, WA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Walmart EV Charging8 ports
Walmart · Available
- Dennys Auburn6 ports
Red E · Available
EV Connect · Temporarily unavailable
- WinCo Foods - Sumner #746 ports
EVgo · Available
What kind of charging does Peak410 Peak410-6 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Peak410 Peak410-6 compare with other stations in Bonney Lake?
Bonney Lake has 18 charging stations in the DOE registry with 25 ports. Peak410 Peak410-6 accounts for 4% of the charging ports in Bonney Lake. ChargePoint runs 17 stations in Bonney Lake. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Peak410 Peak410-6?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 27, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Peak410 Peak410-6 have?
Peak410 Peak410-6 has 1 charging port: 1 Level 2.
Does Peak410 Peak410-6 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Peak410 Peak410-6 have?
Peak410 Peak410-6 has J1772 connectors.
Is Peak410 Peak410-6 open to the public?
Yes. Peak410 Peak410-6 is listed with public access, and its status is available.
Where is Peak410 Peak410-6?
Peak410 Peak410-6 is at 22503 97th Street East, Bonney Lake, WA 98391. Its coordinates are 47.16686, -122.12776.
More EV charging around Bonney Lake
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 404669, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Peak410 Peak410-6, Bonney Lake, WA (AFDC station 404669)”, https://chargecensus.com/stations/washington/peak410-peak410-6-404669 (data as of October 12, 2026).