ChargeCensus

Oak Harbor Station 1

Available

EV charging station in Oak Harbor, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 328450.

At a glance

Oak Harbor Station 1 is a public EV charging station at 1299 SE Dock St in Oak Harbor, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 15, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID328450
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 15, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1299 SE Dock St
ZIP
98277
Coordinates
48.28796, -122.64850

Within ~15 km

Nearby charging

What kind of charging does Oak Harbor Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Oak Harbor Station 1 compare with other stations in Oak Harbor?

Oak Harbor has 17 charging stations in the DOE registry with 21 ports. Oak Harbor Station 1 accounts for 10% of the charging ports in Oak Harbor. ChargePoint runs 15 stations in Oak Harbor. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Oak Harbor Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 15, 2024, one of 456 stations in Washington with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Oak Harbor Station 1 have?

Oak Harbor Station 1 has 2 charging ports: 2 Level 2.

Does Oak Harbor Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Oak Harbor Station 1 have?

Oak Harbor Station 1 has J1772 connectors.

Is Oak Harbor Station 1 open to the public?

Yes. Oak Harbor Station 1 is listed with public access, and its status is available.

Where is Oak Harbor Station 1?

Oak Harbor Station 1 is at 1299 SE Dock St, Oak Harbor, WA 98277. Its coordinates are 48.28796, -122.64850.

More EV charging around Oak Harbor

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 328450, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Oak Harbor Station 1, Oak Harbor, WA (AFDC station 328450)”, https://chargecensus.com/stations/washington/oak-harbor-station-1-328450 (data as of October 12, 2026).