ChargeCensus

Mason County PUD

Available

EV charging station in Shelton, Washington on the Blink network — 1 Level 2. US DOE AFDC station 241195.

At a glance

Mason County PUD is a public EV charging station at 21971 N. Highway 101 in Shelton, Washington, on the Blink network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 7, 2022.

Total ports
1
DC fast
0
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID241195
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateDec 7, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: Free

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
21971 N. Highway 101
ZIP
98584
Coordinates
47.37414, -123.15538

Within ~15 km

Nearby charging

What kind of charging does Mason County PUD offer?

Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”.

How does Mason County PUD compare with other stations in Shelton?

Shelton has 10 charging stations in the DOE registry with 19 ports. Mason County PUD accounts for 5% of the charging ports in Shelton. Blink runs 3 stations in Shelton. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Mason County PUD?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 314 of those stations are in Washington, 9% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 7, 2022, one of 264 stations in Washington with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Mason County PUD have?

Mason County PUD has 1 charging port: 1 Level 2.

Does Mason County PUD have DC fast charging?

No. The registry lists no DC fast ports here; its one port is Level 2.

What connectors does Mason County PUD have?

Mason County PUD has J1772 connectors.

Is charging at Mason County PUD free?

Pricing as reported to the DOE registry: Free.

Is Mason County PUD open to the public?

Yes. Mason County PUD is listed with public access, and its status is available.

Where is Mason County PUD?

Mason County PUD is at 21971 N. Highway 101, Shelton, WA 98584. Its coordinates are 47.37414, -123.15538.

More EV charging around Shelton

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 241195, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Mason County PUD, Shelton, WA (AFDC station 241195)”, https://chargecensus.com/stations/washington/mason-county-pud-241195 (data as of October 12, 2026).