Maple Valley Fred Meyer Store
AvailableEV charging station in Maple Valley, Washington on the Blink network — 4 Level 2. US DOE AFDC station 456501.
At a glance
Maple Valley Fred Meyer Store is a public EV charging station at 26520 Maple Valley-Black Diamond Road SE in Maple Valley, Washington, on the Blink network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 456501 |
| Network | Blink |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 26520 Maple Valley-Black Diamond Road SE
- City
- Maple Valley
- State
- Washington
- ZIP
- 98038
- Coordinates
- 47.36380, -122.01916
Within ~15 km
Nearby charging
- Central Highlands Plaza6 ports
EVgo · Available
- Walmart 5073 (Covington, WA)4 ports
Electrify America · Available
- The Wayne Apartments4 ports
Blink · Available
- Multicare Health Systems3 ports
Blink · Available
- Pacific Raceways2 ports
Non-networked · Available
- Fairwood2 ports
Blink · Available
What kind of charging does Maple Valley Fred Meyer Store offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 35% above the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Maple Valley Fred Meyer Store compare with other stations in Maple Valley?
Maple Valley has 1 charging station in the DOE registry with 4 ports. It is the only Blink station in Maple Valley. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Maple Valley Fred Meyer Store?
Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 314 of those stations are in Washington, 9% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 28, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Maple Valley Fred Meyer Store have?
Maple Valley Fred Meyer Store has 4 charging ports: 4 Level 2.
Does Maple Valley Fred Meyer Store have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Maple Valley Fred Meyer Store have?
Maple Valley Fred Meyer Store has J1772 connectors.
Is Maple Valley Fred Meyer Store open to the public?
Yes. Maple Valley Fred Meyer Store is listed with public access, and its status is available.
Where is Maple Valley Fred Meyer Store?
Maple Valley Fred Meyer Store is at 26520 Maple Valley-Black Diamond Road SE, Maple Valley, WA 98038. Its coordinates are 47.36380, -122.01916.
More EV charging around Maple Valley
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 456501, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Maple Valley Fred Meyer Store, Maple Valley, WA (AFDC station 456501)”, https://chargecensus.com/stations/washington/maple-valley-fred-meyer-store-456501 (data as of October 12, 2026).