ChargeCensus

Lodge at Columbia Point

Available

EV charging station in Richland, Washington on the Red E network — 10 Level 2. US DOE AFDC station 422559.

At a glance

Lodge at Columbia Point is a public EV charging station at 530 Columbia Point Dr in Richland, Washington, on the Red E network. It has 10 charging ports (10 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 18, 2025.

Total ports
10
DC fast
0
Level 2
10
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID422559
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateSep 18, 2025
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
530 Columbia Point Dr
ZIP
99352
Coordinates
46.26311, -119.25227

Within ~15 km

Nearby charging

What kind of charging does Lodge at Columbia Point offer?

Of its 10 ports, 10 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 3.4 times the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.

How does Lodge at Columbia Point compare with other stations in Richland?

Richland has 77 charging stations in the DOE registry with 208 ports, the 8th-most of 244 cities and towns in Washington. Lodge at Columbia Point accounts for 5% of the charging ports in Richland. It is the only Red E station in Richland. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Lodge at Columbia Point?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 22 of those stations are in Washington, under 1% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 18, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lodge at Columbia Point have?

Lodge at Columbia Point has 10 charging ports: 10 Level 2.

Does Lodge at Columbia Point have DC fast charging?

No. The registry lists no DC fast ports here; its 10 ports are all Level 2.

What connectors does Lodge at Columbia Point have?

Lodge at Columbia Point has J1772 connectors.

Is Lodge at Columbia Point open to the public?

Yes. Lodge at Columbia Point is listed with public access, and its status is available.

Where is Lodge at Columbia Point?

Lodge at Columbia Point is at 530 Columbia Point Dr, Richland, WA 99352. Its coordinates are 46.26311, -119.25227.

More EV charging around Richland

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 422559, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lodge at Columbia Point, Richland, WA (AFDC station 422559)”, https://chargecensus.com/stations/washington/lodge-at-columbia-point-422559 (data as of October 12, 2026).