ChargeCensus

Lincoln Square Ls North Dual 4

Available

EV charging station in Bellevue, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 122765.

At a glance

Lincoln Square Ls North Dual 4 is a public EV charging station at 700 Bellevue Way in Bellevue, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 15, 2019.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID122765
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 15, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
700 Bellevue Way
ZIP
98004
Coordinates
47.61702, -122.20110

Within ~15 km

Nearby charging

What kind of charging does Lincoln Square Ls North Dual 4 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Lincoln Square Ls North Dual 4 compare with other stations in Bellevue?

Bellevue has 394 charging stations in the DOE registry with 869 ports, the 2nd-most of 244 cities and towns in Washington. Lincoln Square Ls North Dual 4 accounts for under 1% of the charging ports in Bellevue. ChargePoint runs 342 stations in Bellevue. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Lincoln Square Ls North Dual 4?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 15, 2019, one of 117 stations in Washington with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lincoln Square Ls North Dual 4 have?

Lincoln Square Ls North Dual 4 has 2 charging ports: 2 Level 2.

Does Lincoln Square Ls North Dual 4 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Lincoln Square Ls North Dual 4 have?

Lincoln Square Ls North Dual 4 has J1772 connectors.

Is Lincoln Square Ls North Dual 4 open to the public?

Yes. Lincoln Square Ls North Dual 4 is listed with public access, and its status is available.

Where is Lincoln Square Ls North Dual 4?

Lincoln Square Ls North Dual 4 is at 700 Bellevue Way, Bellevue, WA 98004. Its coordinates are 47.61702, -122.20110.

More EV charging around Bellevue

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 122765, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lincoln Square Ls North Dual 4, Bellevue, WA (AFDC station 122765)”, https://chargecensus.com/stations/washington/lincoln-square-ls-north-dual-4-122765 (data as of October 12, 2026).