Lincoln County Museum
AvailableEV charging station in Davenport, Washington, not on a charging network — 1 Level 2. US DOE AFDC station 81083.
At a glance
Lincoln County Museum is a public EV charging station at 600 7th St in Davenport, Washington, not attached to a charging network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 1, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 81083 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Museum |
| Open date | Oct 1, 2016 |
| Last updated at source | Oct 5, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 600 7th St
- City
- Davenport
- State
- Washington
- ZIP
- 99122
- Coordinates
- 47.65292, -118.15036
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Lincoln County Museum offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a museum location.
How does Lincoln County Museum compare with other stations in Davenport?
Davenport has 3 charging stations in the DOE registry with 5 ports. Lincoln County Museum accounts for 20% of the charging ports in Davenport. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Lincoln County Museum?
Lincoln County Museum is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 1, 2016, one of 54 stations in Washington with a 2016 open date. The station's record was last updated at the source on Oct 5, 2026.
Frequently asked questions
How many chargers does Lincoln County Museum have?
Lincoln County Museum has 1 charging port: 1 Level 2.
Does Lincoln County Museum have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Lincoln County Museum have?
Lincoln County Museum has J1772 connectors.
Is charging at Lincoln County Museum free?
Pricing as reported to the DOE registry: Free.
Is Lincoln County Museum open to the public?
Yes. Lincoln County Museum is listed with public access, and its status is available.
Where is Lincoln County Museum?
Lincoln County Museum is at 600 7th St, Davenport, WA 99122. Its coordinates are 47.65292, -118.15036.
More EV charging around Davenport
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 81083, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lincoln County Museum, Davenport, WA (AFDC station 81083)”, https://chargecensus.com/stations/washington/lincoln-county-museum-81083 (data as of October 12, 2026).