ChargeCensus

Lc Transit Mineral 2

Available

EV charging station in Mineral, Washington on the ChargePoint network — 1 DC fast. US DOE AFDC station 460313.

At a glance

Lc Transit Mineral 2 is a public EV charging station at 104 West Front Street in Mineral, Washington, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since May 29, 2026.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID460313
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 29, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
104 West Front Street
City
Mineral
ZIP
98355
Coordinates
46.71713, -122.18041

Within ~15 km

Nearby charging

What kind of charging does Lc Transit Mineral 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 66% below the Washington average of 3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Lc Transit Mineral 2 compare with other stations in Mineral?

Mineral has 2 charging stations in the DOE registry with 2 ports. Lc Transit Mineral 2 accounts for 50% of the charging ports in Mineral. ChargePoint runs 2 stations in Mineral. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Lc Transit Mineral 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 29, 2026, one of 657 stations in Washington with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Lc Transit Mineral 2 have?

Lc Transit Mineral 2 has 1 charging port: 1 DC fast.

Does Lc Transit Mineral 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Lc Transit Mineral 2, with CHAdeMO and CCS connectors.

What connectors does Lc Transit Mineral 2 have?

Lc Transit Mineral 2 has CHAdeMO and CCS connectors.

Is Lc Transit Mineral 2 open to the public?

Yes. Lc Transit Mineral 2 is listed with public access, and its status is available.

Where is Lc Transit Mineral 2?

Lc Transit Mineral 2 is at 104 West Front Street, Mineral, WA 98355. Its coordinates are 46.71713, -122.18041.

More EV charging around Mineral

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 460313, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Lc Transit Mineral 2, Mineral, WA (AFDC station 460313)”, https://chargecensus.com/stations/washington/lc-transit-mineral-2-460313 (data as of October 12, 2026).