ChargeCensus

Korum Hyundai Pc 2

Available

EV charging station in Puyallup, Washington on the ChargePoint network — 1 DC fast. US DOE AFDC station 214875.

At a glance

Korum Hyundai Pc 2 is a public EV charging station at 111 River Rd in Puyallup, Washington, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Apr 22, 2022.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID214875
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 22, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
111 River Rd
ZIP
98371
Coordinates
47.19942, -122.29509

Within ~15 km

Nearby charging

What kind of charging does Korum Hyundai Pc 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 66% below the Washington average of 3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Korum Hyundai Pc 2 compare with other stations in Puyallup?

Puyallup has 35 charging stations in the DOE registry with 87 ports, the 18th-most of 244 cities and towns in Washington. Korum Hyundai Pc 2 accounts for 1% of the charging ports in Puyallup. ChargePoint runs 21 stations in Puyallup. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Korum Hyundai Pc 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 22, 2022, one of 264 stations in Washington with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Korum Hyundai Pc 2 have?

Korum Hyundai Pc 2 has 1 charging port: 1 DC fast.

Does Korum Hyundai Pc 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Korum Hyundai Pc 2, with CHAdeMO and CCS connectors.

What connectors does Korum Hyundai Pc 2 have?

Korum Hyundai Pc 2 has CHAdeMO and CCS connectors.

Is Korum Hyundai Pc 2 open to the public?

Yes. Korum Hyundai Pc 2 is listed with public access, and its status is available.

Where is Korum Hyundai Pc 2?

Korum Hyundai Pc 2 is at 111 River Rd, Puyallup, WA 98371. Its coordinates are 47.19942, -122.29509.

More EV charging around Puyallup

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 214875, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Korum Hyundai Pc 2, Puyallup, WA (AFDC station 214875)”, https://chargecensus.com/stations/washington/korum-hyundai-pc-2-214875 (data as of October 12, 2026).