Kinects 108
AvailableEV charging station in Seattle, Washington on the ChargePoint network — 1 Level 2. US DOE AFDC station 429759.
At a glance
Kinects 108 is a public EV charging station at 1823 Minor Ave in Seattle, Washington, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 11, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 429759 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 11, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1823 Minor Ave
- City
- Seattle
- State
- Washington
- ZIP
- 98101
- Coordinates
- 47.61729, -122.33141
Within ~15 km
Nearby charging
- 145th Shoreline MUR-70102 ports
OpConnect · Available
- Google52 ports
ChargePoint · Available
- City of Seattle - Muni Tower32 ports
Non-networked · Available
- Alexan Shoreline28 ports
OpConnect · Planned
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
What kind of charging does Kinects 108 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Kinects 108 compare with other stations in Seattle?
Seattle has 679 charging stations in the DOE registry with 1,890 ports, the most of 244 cities and towns in Washington. Kinects 108 accounts for under 1% of the charging ports in Seattle. ChargePoint runs 483 stations in Seattle. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Kinects 108?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 11, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Kinects 108 have?
Kinects 108 has 1 charging port: 1 Level 2.
Does Kinects 108 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Kinects 108 have?
Kinects 108 has J1772 connectors.
Is Kinects 108 open to the public?
Yes. Kinects 108 is listed with public access, and its status is available.
Where is Kinects 108?
Kinects 108 is at 1823 Minor Ave, Seattle, WA 98101. Its coordinates are 47.61729, -122.33141.
More EV charging around Seattle
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 429759, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Kinects 108, Seattle, WA (AFDC station 429759)”, https://chargecensus.com/stations/washington/kinects-108-429759 (data as of October 12, 2026).