Ikea USA Renton 2
AvailableEV charging station in Renton, Washington on the ChargePoint network — 1 Level 2. US DOE AFDC station 252922.
At a glance
Ikea USA Renton 2 is a public EV charging station at 601 SW 41st St in Renton, Washington, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 1, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 252922 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Feb 1, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 601 SW 41st St
- City
- Renton
- State
- Washington
- ZIP
- 98057
- Coordinates
- 47.44279, -122.22728
Within ~15 km
Nearby charging
Non-networked · Available
- HUB Garage43 ports
Blink · Available
Non-networked · Available
- CSC Parking21 ports
OpConnect · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Ikea USA Renton 2 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 66% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Ikea USA Renton 2 compare with other stations in Renton?
Renton has 44 charging stations in the DOE registry with 130 ports, the 12th-most of 244 cities and towns in Washington. Ikea USA Renton 2 accounts for under 1% of the charging ports in Renton. ChargePoint runs 24 stations in Renton. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Ikea USA Renton 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 1, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Ikea USA Renton 2 have?
Ikea USA Renton 2 has 1 charging port: 1 Level 2.
Does Ikea USA Renton 2 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Ikea USA Renton 2 have?
Ikea USA Renton 2 has J1772 connectors.
Is Ikea USA Renton 2 open to the public?
Yes. Ikea USA Renton 2 is listed with public access, and its status is available.
Where is Ikea USA Renton 2?
Ikea USA Renton 2 is at 601 SW 41st St, Renton, WA 98057. Its coordinates are 47.44279, -122.22728.
More EV charging around Renton
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 252922, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Ikea USA Renton 2, Renton, WA (AFDC station 252922)”, https://chargecensus.com/stations/washington/ikea-usa-renton-2-252922 (data as of October 12, 2026).