Greenbank Farm
AvailableEV charging station in Greenbank, Washington, not on a charging network — 2 Level 2. US DOE AFDC station 320156.
At a glance
Greenbank Farm is a public EV charging station at 765 Wonn Rd in Greenbank, Washington, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 16, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 320156 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Other |
| Open date | Nov 16, 2023 |
| Last updated at source | Feb 2, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: Free
Location
- Address
- 765 Wonn Rd
- City
- Greenbank
- State
- Washington
- ZIP
- 98253
- Coordinates
- 48.10666, -122.57457
Within ~15 km
Nearby charging
- Greenbank Farm12 ports
EVCS · Available
Tesla Destination · Available
evGateway · Available
- Coupeville Coupeville #12 ports
ChargePoint · Available
- Coupeville Coupeville #22 ports
ChargePoint · Available
- Barnyard The Barnyard2 ports
ChargePoint · Available
What kind of charging does Greenbank Farm offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. Pricing as reported to the registry: “Free”. The site is listed as a other location.
How does Greenbank Farm compare with other stations in Greenbank?
Greenbank has 2 charging stations in the DOE registry with 14 ports. Greenbank Farm accounts for 14% of the charging ports in Greenbank. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Greenbank Farm?
Greenbank Farm is listed as non-networked: its chargers are not run through a charging-network account. Washington has 347 non-networked stations, 10% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 16, 2023, one of 489 stations in Washington with a 2023 open date. The station's record was last updated at the source on Feb 2, 2026.
Frequently asked questions
How many chargers does Greenbank Farm have?
Greenbank Farm has 2 charging ports: 2 Level 2.
Does Greenbank Farm have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Greenbank Farm have?
Greenbank Farm has J1772 connectors.
Is charging at Greenbank Farm free?
Pricing as reported to the DOE registry: Free.
Is Greenbank Farm open to the public?
Yes. Greenbank Farm is listed with public access, and its status is available.
Where is Greenbank Farm?
Greenbank Farm is at 765 Wonn Rd, Greenbank, WA 98253. Its coordinates are 48.10666, -122.57457.
More EV charging around Greenbank
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 320156, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Greenbank Farm, Greenbank, WA (AFDC station 320156)”, https://chargecensus.com/stations/washington/greenbank-farm-320156 (data as of October 12, 2026).