Granite Falls City Hall
AvailableEV charging station in Granite Falls, Washington on the FLO network — 3 Level 2. US DOE AFDC station 405358.
At a glance
Granite Falls City Hall is a public EV charging station at 215 South Granite Avenue in Granite Falls, Washington, on the FLO network. It has 3 charging ports (3 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 3, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 405358 |
| Network | FLO |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 3, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 215 South Granite Avenue
- City
- Granite Falls
- State
- Washington
- ZIP
- 98252
- Coordinates
- 48.08158, -121.96875
Within ~15 km
Nearby charging
- Vintage at Soper Hill12 ports
Noodoe · Available
- Walmart EV Charging8 ports
Walmart · Available
- Soper C Store6 ports
Blink · Available
Electrify America · Available
- Slbp Station 42 ports
ChargePoint · Available
- Koz Weaver Weaver Rd Right2 ports
ChargePoint · Available
What kind of charging does Granite Falls City Hall offer?
Of its 3 ports, 3 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Granite Falls City Hall compare with other stations in Granite Falls?
Granite Falls has 1 charging station in the DOE registry with 3 ports. It is the only FLO station in Granite Falls. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Granite Falls City Hall?
FLO operates 1,246 stations in the registry across 40 states, with 179 DC fast and 2,934 Level 2 ports in total. 166 of those stations are in Washington, 5% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 3, 2025, one of 557 stations in Washington with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Granite Falls City Hall have?
Granite Falls City Hall has 3 charging ports: 3 Level 2.
Does Granite Falls City Hall have DC fast charging?
No. The registry lists no DC fast ports here; its 3 ports are all Level 2.
What connectors does Granite Falls City Hall have?
Granite Falls City Hall has J1772 connectors.
Is Granite Falls City Hall open to the public?
Yes. Granite Falls City Hall is listed with public access, and its status is available.
Where is Granite Falls City Hall?
Granite Falls City Hall is at 215 South Granite Avenue, Granite Falls, WA 98252. Its coordinates are 48.08158, -121.96875.
More EV charging around Granite Falls
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 405358, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Granite Falls City Hall, Granite Falls, WA (AFDC station 405358)”, https://chargecensus.com/stations/washington/granite-falls-city-hall-405358 (data as of October 12, 2026).