ChargeCensus

Google Wa-Ku-04

Available

EV charging station in Kirkland, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 352643.

At a glance

Google Wa-Ku-04 is a public EV charging station at 425 Urban Plaza Way Suite 260 in Kirkland, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 15, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID352643
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 15, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
425 Urban Plaza Way Suite 260
ZIP
98033
Coordinates
47.67817, -122.19951

Within ~15 km

Nearby charging

What kind of charging does Google Wa-Ku-04 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Google Wa-Ku-04 compare with other stations in Kirkland?

Kirkland has 67 charging stations in the DOE registry with 294 ports, the 9th-most of 244 cities and towns in Washington. Google Wa-Ku-04 accounts for under 1% of the charging ports in Kirkland. ChargePoint runs 41 stations in Kirkland. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Google Wa-Ku-04?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 15, 2024, one of 456 stations in Washington with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Google Wa-Ku-04 have?

Google Wa-Ku-04 has 2 charging ports: 2 Level 2.

Does Google Wa-Ku-04 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Google Wa-Ku-04 have?

Google Wa-Ku-04 has J1772 connectors.

Is Google Wa-Ku-04 open to the public?

Yes. Google Wa-Ku-04 is listed with public access, and its status is available.

Where is Google Wa-Ku-04?

Google Wa-Ku-04 is at 425 Urban Plaza Way Suite 260, Kirkland, WA 98033. Its coordinates are 47.67817, -122.19951.

More EV charging around Kirkland

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 352643, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Google Wa-Ku-04, Kirkland, WA (AFDC station 352643)”, https://chargecensus.com/stations/washington/google-wa-ku-04-352643 (data as of October 12, 2026).