ChargeCensus

Estates At Coug Office 2

Available

EV charging station in Issaquah, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 237314.

At a glance

Estates At Coug Office 2 is a public EV charging station at 2137 NW Shy Bear Way in Issaquah, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 8, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID237314
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 8, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2137 NW Shy Bear Way
ZIP
98027
Coordinates
47.53014, -122.07034

Within ~15 km

Nearby charging

What kind of charging does Estates At Coug Office 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Estates At Coug Office 2 compare with other stations in Issaquah?

Issaquah has 39 charging stations in the DOE registry with 119 ports, the 17th-most of 244 cities and towns in Washington. Estates At Coug Office 2 accounts for 2% of the charging ports in Issaquah. ChargePoint runs 27 stations in Issaquah. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Estates At Coug Office 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 8, 2022, one of 264 stations in Washington with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Estates At Coug Office 2 have?

Estates At Coug Office 2 has 2 charging ports: 2 Level 2.

Does Estates At Coug Office 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Estates At Coug Office 2 have?

Estates At Coug Office 2 has J1772 connectors.

Is Estates At Coug Office 2 open to the public?

Yes. Estates At Coug Office 2 is listed with public access, and its status is available.

Where is Estates At Coug Office 2?

Estates At Coug Office 2 is at 2137 NW Shy Bear Way, Issaquah, WA 98027. Its coordinates are 47.53014, -122.07034.

More EV charging around Issaquah

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 237314, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Estates At Coug Office 2, Issaquah, WA (AFDC station 237314)”, https://chargecensus.com/stations/washington/estates-at-coug-office-2-237314 (data as of October 12, 2026).