Estates At Coug 2153
AvailableEV charging station in Issaquah, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 237310.
At a glance
Estates At Coug 2153 is a public EV charging station at 2196 NW Shy Bear Way in Issaquah, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 8, 2022.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 237310 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 8, 2022 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2196 NW Shy Bear Way
- City
- Issaquah
- State
- Washington
- ZIP
- 98027
- Coordinates
- 47.53150, -122.07265
Within ~15 km
Nearby charging
- Google52 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
- Google24 ports
ChargePoint · Available
- The Meyden20 ports
Blink · Available
- AMLI Redmond Wy19 ports
Loop · Available
Tesla Supercharger · Available
What kind of charging does Estates At Coug 2153 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Estates At Coug 2153 compare with other stations in Issaquah?
Issaquah has 39 charging stations in the DOE registry with 119 ports, the 17th-most of 244 cities and towns in Washington. Estates At Coug 2153 accounts for 2% of the charging ports in Issaquah. ChargePoint runs 27 stations in Issaquah. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.
Who operates Estates At Coug 2153?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 8, 2022, one of 264 stations in Washington with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Estates At Coug 2153 have?
Estates At Coug 2153 has 2 charging ports: 2 Level 2.
Does Estates At Coug 2153 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Estates At Coug 2153 have?
Estates At Coug 2153 has J1772 connectors.
Is Estates At Coug 2153 open to the public?
Yes. Estates At Coug 2153 is listed with public access, and its status is available.
Where is Estates At Coug 2153?
Estates At Coug 2153 is at 2196 NW Shy Bear Way, Issaquah, WA 98027. Its coordinates are 47.53150, -122.07265.
More EV charging around Issaquah
Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 237310, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Estates At Coug 2153, Issaquah, WA (AFDC station 237310)”, https://chargecensus.com/stations/washington/estates-at-coug-2153-237310 (data as of October 12, 2026).