ChargeCensus

Esd Exit 68 Dcfc 2

Available

EV charging station in Chehalis, Washington on the ChargePoint network — 1 DC fast. US DOE AFDC station 326217.

At a glance

Esd Exit 68 Dcfc 2 is a public EV charging station at 172 US-12 in Chehalis, Washington, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 20, 2024.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID326217
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 20, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
172 US-12
City
Chehalis
ZIP
98532
Coordinates
46.54650, -122.87051

Within ~15 km

Nearby charging

What kind of charging does Esd Exit 68 Dcfc 2 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 66% below the Washington average of 3 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Esd Exit 68 Dcfc 2 compare with other stations in Chehalis?

Chehalis has 9 charging stations in the DOE registry with 24 ports. Esd Exit 68 Dcfc 2 accounts for 4% of the charging ports in Chehalis. ChargePoint runs 6 stations in Chehalis. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates Esd Exit 68 Dcfc 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 20, 2024, one of 456 stations in Washington with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Esd Exit 68 Dcfc 2 have?

Esd Exit 68 Dcfc 2 has 1 charging port: 1 DC fast.

Does Esd Exit 68 Dcfc 2 have DC fast charging?

Yes. The registry lists 1 DC fast port at Esd Exit 68 Dcfc 2, with CHAdeMO and CCS connectors.

What connectors does Esd Exit 68 Dcfc 2 have?

Esd Exit 68 Dcfc 2 has CHAdeMO and CCS connectors.

Is Esd Exit 68 Dcfc 2 open to the public?

Yes. Esd Exit 68 Dcfc 2 is listed with public access, and its status is available.

Where is Esd Exit 68 Dcfc 2?

Esd Exit 68 Dcfc 2 is at 172 US-12, Chehalis, WA 98532. Its coordinates are 46.54650, -122.87051.

More EV charging around Chehalis

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 326217, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Esd Exit 68 Dcfc 2, Chehalis, WA (AFDC station 326217)”, https://chargecensus.com/stations/washington/esd-exit-68-dcfc-2-326217 (data as of October 12, 2026).