ChargeCensus

City Of Redmond City Hall Dual

Available

EV charging station in Redmond, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 38959.

At a glance

City Of Redmond City Hall Dual is a public EV charging station at 15670 NE 85th St in Redmond, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 15, 2011.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID38959
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMar 15, 2011
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
15670 NE 85th St
ZIP
98052
Coordinates
47.67922, -122.12995

Within ~15 km

Nearby charging

What kind of charging does City Of Redmond City Hall Dual offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of Redmond City Hall Dual compare with other stations in Redmond?

Redmond has 106 charging stations in the DOE registry with 315 ports, the 6th-most of 244 cities and towns in Washington. City Of Redmond City Hall Dual accounts for under 1% of the charging ports in Redmond. ChargePoint runs 77 stations in Redmond. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates City Of Redmond City Hall Dual?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 15, 2011, one of 33 stations in Washington with a 2011 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of Redmond City Hall Dual have?

City Of Redmond City Hall Dual has 2 charging ports: 2 Level 2.

Does City Of Redmond City Hall Dual have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of Redmond City Hall Dual have?

City Of Redmond City Hall Dual has J1772 connectors.

Is City Of Redmond City Hall Dual open to the public?

Yes. City Of Redmond City Hall Dual is listed with public access, and its status is available.

Where is City Of Redmond City Hall Dual?

City Of Redmond City Hall Dual is at 15670 NE 85th St, Redmond, WA 98052. Its coordinates are 47.67922, -122.12995.

More EV charging around Redmond

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 38959, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of Redmond City Hall Dual, Redmond, WA (AFDC station 38959)”, https://chargecensus.com/stations/washington/city-of-redmond-city-hall-dual-38959 (data as of October 12, 2026).