ChargeCensus

City Of Lacey City Hall 1

Available

EV charging station in Lacey, Washington on the ChargePoint network — 2 Level 2. US DOE AFDC station 360581.

At a glance

City Of Lacey City Hall 1 is a public EV charging station at 420 College Street Southeast in Lacey, Washington, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 23, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID360581
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateOct 23, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
420 College Street Southeast
City
Lacey
ZIP
98503
Coordinates
47.04537, -122.82197

Within ~15 km

Nearby charging

What kind of charging does City Of Lacey City Hall 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 33% below the Washington average of 3 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of Lacey City Hall 1 compare with other stations in Lacey?

Lacey has 50 charging stations in the DOE registry with 116 ports, the 11th-most of 244 cities and towns in Washington. City Of Lacey City Hall 1 accounts for 2% of the charging ports in Lacey. ChargePoint runs 37 stations in Lacey. Statewide, Washington has 3,447 stations and 10,216 ports, the 6th-largest station count of the 51 states and DC. The biggest station in Washington, Pasco Wa Sdc in Pasco, has 144 ports.

Who operates City Of Lacey City Hall 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,972 of those stations are in Washington, 57% of the state's 3,447.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 23, 2024, one of 456 stations in Washington with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of Lacey City Hall 1 have?

City Of Lacey City Hall 1 has 2 charging ports: 2 Level 2.

Does City Of Lacey City Hall 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of Lacey City Hall 1 have?

City Of Lacey City Hall 1 has J1772 connectors.

Is City Of Lacey City Hall 1 open to the public?

Yes. City Of Lacey City Hall 1 is listed with public access, and its status is available.

Where is City Of Lacey City Hall 1?

City Of Lacey City Hall 1 is at 420 College Street Southeast, Lacey, WA 98503. Its coordinates are 47.04537, -122.82197.

More EV charging around Lacey

Working with Washington charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 360581, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of Lacey City Hall 1, Lacey, WA (AFDC station 360581)”, https://chargecensus.com/stations/washington/city-of-lacey-city-hall-1-360581 (data as of October 12, 2026).